We recently put up a roof for a client and removed the second level in the house.
We started by building up the exterior walls, to get the correct pitch, we built the roof structure with galvanized steel beams, secured the sandwich panels, backfilled, broke away the second level floor, used the rubble to build the ground level up in the room by 1m.