Fearless Earth built 3 gazebos
The guys recently did some beautiful work, they just finished constructing 3 gazebos and a sundeck for a client. Really great job!!!👌
Angled roof build
We cut and lowered the front beam to accommodate the angled roof. Fitted 2 uprights over the stairs and secured to floor, On complete structure, we fit beams every 600mm to accommodate batons and roof tiles. Secure to stone, using wall anchors. Set tiles in place cutting for 90 degree angle over stairs, when in position, cement and set caping tiles over corner.
120m Fence
Well done to our hardworking men that erected this fence, you did a great job. The client required paddocks for his horse and goats. We used 1.5m Farm fence with 100mm posts every 2 meters cemented in 700mm deep. Length including enclosure for goats estimated at 120m, 1,5m x 1.5m steel gate on bullet hinges and covered with same farm fence. Slide bolt locking system.
Compost toilet build
We built a compost toilet for a client at our workshop, using larch and spruce wood, corregated metal sheets, the wood was treated.
New roof for client
We recently put up a roof for a client and removed the second level in the house.
8 Solar panel frame
We recently did a Solar installation job for a client, we built the Solar frame in our workshop, they pivot, so it’s able to be orienated with the movement of the sun. We then transported it to the clients house and assembled it there. Finally we attached the solar panels to the frames and secured everything.
High Pressure cleaning courtyard and painting a wall.
We cleared up and high pressure cleaned the courtyard, then we cleaned and painted the long wall. 1 and a half days to complete this job.
175m of weldmesh fence
We put up 175m of weldmesh fence with treated wood posts and 2 vehicle access gates.
Just some men Sawmilling!
We cut 20 trees into usable planks for a client. Such a useful machine to have!!
Water tank restoration
We restored a water tank for a client, started by chipping off old loose plaster, high pressure cleaned, filled and patched cracked and broken areas, lastly we replastered and waterproofed the tank. Looks a lot prettier!